Episode details

Radio Cumbria,5 mins
Locals "delighted" Ulverston line re-opens
Available for over a year
Flood damage to the Barrow to Lancaster line has been repaired ahead of time. It was expected to take until Friday to remove 240 tons of soil and rocks washed into the cutting. Here's how passengers coped this weekend after this local lifeline was severed. Picture - Network Rail
Programme Website